Внедрение одновременно-раздельной закачки на Приобском месторождении

О М Гарипов, G. I. Davitashvili · Нефтяное хозяйство · 2006

Three layers, integrated in one production facility, are developed at Priobskoye deposit. Their joint operation at the organization of reservoir pressure maintenance system has caused a number of problems, which have been successfully solved by introduction of multi packer configurations of, the underground equipment for simultaneously separate pumping(SSP) of water. It is marked, that SSP enables to control field parameters of wells operation in a real time mode, allowing to carry out the operative control and regulation of processes of reserves development over each layer. The technology of application and results of introduction SSP at Priobkoye deposit are given.