프리캐스트 모듈간 연결부 방수성능 검증을 위한 실험적 분석
이종순, 이준경, 김희성 et al. · 한국철도학회 학술발표대회논문집 · 2016
The excavating ground with installation of temporary structures and lining is general construction method for installation of a near-surface underground box-structure in the downtown road. As this general method has shortcomings such as lining installation process and long construction period, the research for rapid construction by constructing an underground box-structure applied with precast module structure with Top-down method is in progress. The water-proof verification experiment was performed using an element small size of 6 types and full-scale large size of 1 type considered arrangement and installation for water stop and water swelling rubber and its composite combination. As the result, it is verified that composite water-stop and only water swelling rubber have good performance for leakage.
Cited by 0 works.