Влияние надежности подъемных установок на эффективность работы бригад текущего ремонта скважин

М М Иванкив, Alexandra Kuznetsov, Константин Александрович Кузнецов et al. · Нефтяное хозяйство · 2010

The dynamics of down time of well repair work teams, caused by the failures of pulling units, is given. The results of relia - bility studies of the basic components of pulling units AR32/40M are presented. The parameters and the laws of distribu - tions of mean-time-between-failures of the inspected pulling units components are determined.

Cited by 0 works.

Authors