사장-현수교 가설 중 내풍안전성 향상 방안 검토

이호, 김호경, 김모세 et al. · 한국강구조학회 학술발표대회 논문집 · 2015

Long span cable-stayed suspension bridge has hangers on the inside of deck due to the train load placed on the center of deck and transverse distribution load of wide girder. In particular, the early stage of erection deck of suspended part which has weak torsional rigidity than final state can cause excessive torsion in the girder by wind load. Therefore, it is important to secure the wind stability during erection. First, Construction stage analysis have been performed and found the most unfavorable erection phase. Then, evaluation of wind stability were performed by numerical buffeting analysis. Further research was carried out to improve the wind stability during erection stage by the addition of structural measures. In order to increase the torsional stiffness of the deck, it is possible to cross X-type bracing cable connecting main cable with deck and to replace hanger of suspension part to Rigid beams. And the use of Strut connecting each main cable has been suggested as a way to diminish torsional deformation of girders that may be occurred by asymmetric vertical mode of main cable in the early erection of suspended deck. Above methods were found out to be efficient to reduce the torsional deformation of deck. But X-type bracing cables need to adjust the length of the cable for each erection phase. For rigid beam, limited usage can be adapted. On the other hand, strut has less limitation compared to those methods, however economic problem should be reviewed depend on the number of its uses.

Cited by 0 works.

Authors