라스트 플래너 시스템을 활용한 자재조달관리의 개선방안에 관한 연구

고현우, 강현욱, 김용수 · 대한건축학회 춘계 우수졸업논문전 수상논문 개요집 · 2008

The purpose of this study was to analyze the application of Last Planner System by Material management. The adapted research method a It analyzes the points at issue of Prima and Mat plaza after searching its system which is now in commonly using for material procurement. Based on the analyzed issues. it suggests the plan for material procurement management and integrated management system for construction schedule and materials applied with Last Planner System. The result of this study are as follows: 1) Each element of construction schedule and material management system removes the unnecessary managements and works with combining common features of them. 2) Building the Material Procurement System applied with Last Planner System, it can improve the rapidity and accuracy on making determination between owner and contractor.