Методика определения динамически устойчивых размеров обнажений трещиноватого горного массива на сопряжениях выработок и железнодорожных тоннелей
Тюпин Владимир Николаевич · Вестник Забайкальского государственного университета · 2016
The author has determined that geomechanical processes, occurring in mountain ranges when drifting through railway tunnels and their conjugacies, significantly affect the cost and work safety. Invalid selected geomechanical parameters: sustainable spans outcrops and dimensionally stable pillars lead to an increase in the cost of mining-preparatory works and reduce the level of security due to possible unpredictable collapse of rocks from outcrops or pillars. Technical analysis of the literature was conducted to establish the size of dynamically stable exposures. It is found that the calculation of stable dimensions exposures usually considers mining pressure and rock strength characteristics. Not up to standard fracturing parameters are taken into account, as well as the dynamic effect of the explosion to create openings and seismic action removes of the explosions. In this article the theoretical formula on defining dynamically stable outcrops when drifting through mine workings and their conjugacies, developed on the basis of the law of energy safety is given. The substitution into the theoretical dependence slightly varying parameters, has led to the development of engineering formulas for determining the stability of horizontal spans of exposure, depending on the fracture parameters and the coefficient of friction between the parts in the massif. The engineering formulas for calculating dynamically stable exposures sizes depending on the ratio of the fortress rock are obtained for mines of PJSC «Priargunsk Industrial Mining and Chemical Union» (PIMCU). The numerical values of dynamically stable flown outcrops are given. The method of drifting through mine workings and their conjugacies, protected by a patent for an invention are suggested. These studies may provide a basis for the design of mining and preparatory work in different types of systems' work on the deposits in various geological and mining conditions, reduce the cost of ore mining by underground methods, and improve the level of safety of operations
Cited by 0 works.