Обоснование достоверности модели функционально-параметрического состояния водонапорной башни системы водоснабжения объектов сельскохозяйственного назначения

Асманкин Евгений Михайлович, Ушаков Юрий Андреевич, Фомин Максим Борисович et al. · Известия Оренбургского государственного аграрного университета · 2016

One of the topical problems of water-supply, in rural areas particularly, is failures in the water tower operation in winter, being due to breakdowns in the cycle of water consumption, water stagnation, failures in water level sensors, water leaks and overflows. The conceptual model purposed to improve the operation efficiency of agricultural hydraulic structures of tower type at low air temperatures is considered in the article. The experimental part of the study was carried out in the Alexandrovsky district of Orenburg region at the period of active temperature range (-30°; -5°C), under the conditions of intensive heat exchange of the water tower XB-15U-10, aggregated with the wind-power unit «Aergon», and ambient air. The methods of experimental studies were based on the mathematical description of aerologic events, physical modeling of radiogenic energy realization, as well as on the theory of heat exchange processes and the provisions of fluid mechanics. Taking into account the fact that the water-towers, being designed with a high level of resistance to icing, belong to combined technological systems, there was developed a system of calculation methods based on the set of heat sources and heat losses, occurring in the specific thermo-physical model and, in accord with the laws of ice mass distribution, at different phases of the technological system. The possibility of using the Weisbull distribution function to determine the liquid and solid phases of the water tanks filler as well as the results of theoretical and experimental studies on the volume of ice build-up in the temperature range under study have been considered. The graphs of the planar and spatial visualization of the volume of ice formed in the process of the water-tower operation and analysis of its functional state for different conditions of agricultural production have been constructed. The conducting of calculation procedures with the factor values at the phase of the discrete water consumption showed the accuracy and adequacy of the mathematical interpretation of ice formation in the stem of the water tower at the time of its closing. It is proved that the technical control of the parameters of the on-wall water layer increases the functioning time of the tower under design operation in extreme situations at 1.63-1.99 times.

Cited by 0 works.

Authors