대형 오피스 건물에서 피크 냉방부하에 대한 검토

이정훈, 안승현, 이상엽 et al. · 추계학술발표대회 · 2013

There is a difference between design value and actual demand for HVAC peak load because of the input data to calculate the peak load such as internal heat gains, occupancy schedule, lighting/equipment schedule and weather data. Also, this discrepancy attribute to the safety factor for designed value. The over-sized HVAC peak load and system size affect the initial construction cost and building energy performance. In this study, conventional peak load calculation data will be compared with the data using the input data for ASHRAE and actual building operation data(BEMS data) by EnergyPlus. The analysis was accomplished for the office building in use. The results showed that the peak load calculated by conventional method are over-sized by nearly 40% compared to the result of ASHRAE input data and actual demand for the target building. Especially, the load caused by lighting shows the big difference.