발전용 대형 가스터빈 엔진의 시동성능 향상

박준철, 김상조, 김종선 · 대한기계학회 춘추학술대회 · 2016

Doosan has been developing industrial gas turbine which has large capacity of 270MW in power and competitive thermal efficiency over 40%. Start-up performance is also one of important key performance for the power plant customer in terms of operational flexibility. Especially the acceleration time should be satisfied with the product target with high reliability. Therefore in this study quantitative effect of starting power increase has been evaluated in terms of acceleration time reduction and the turbine temperature level related to hot part life. These results will be used for the required starting device capacity estimation and the test condition set-up during the engine test.

Cited by 0 works.

Authors