중소규모 리모델링공사의 안전진단 적용 방안에 관한 연구

손창환, 홍성욱, 안용선 · 대한건축학회지회연합회 논문집 · 2007

This study aims to find out problems through pilot survey of Safety Diagnosis in small and medium scale remodeling construction. And then this study derives priority indexes of problems through questionnaire survey and suggests betterments in the Safety Diagnosis and checks of remodeling construction. The process of study is as follows. Firstly, Through synthetic analysis of theoretical study, case study, and problems which are suggested in the pilot survey, 28 problems were derived (14 problems of constructor, 14 problems of agency of safety diagnosis). Secondly, Through questionnaire survey of 28 problems which were derived before, priority indexes of problems were decided. And after descriptive analysis was executed. Thirdly, 5 betterments were suggested through 14 betterments of high indexes which were derived from the descriptive analysis.

Cited by 0 works.

Authors