КОМПЛЕКСНОЕ ВОЗДЕЙСТВИЕ НА ПРОДУКТИВНЫЙ ПЛАСТ ПРИ ВТОРИЧНОМ ВСКРЫТИИ С ПОМОЩЬЮ ГИДРОМЕХАНИЧЕСКОЙ ЩЕЛЕВОЙ ПЕРФОРАЦИИ
Токарев Михаил Андреевич, Н. М. Токарева, S.G. Zubairov · 2016
One of the well stimulation methods is the casing perforationusing the equipment of various configurations.The essential drawback of a commonly used cumulative perforation is the shallowness of perforation tunnels. Significant impact loads and high temperatures in thisregard affect negatively on cement stone and rock conditions in bottom-hole zone. The technique of hydromechanical slotted perforation(HSP) is free from this drawback. At the first stage of the well penetration by means of this method, casing is cut in the designed intervalby a knurling disk. Then cement stone and rock are broken by high pressure water jet. As of 01.01.2013 the authors of the articleperformed 219 treatments at the facilities operated by PJSC Tatneft at the areas of eight OGPDs (Oil and gas production departments). The operation HSP+BHT (bottom-hole treatment) at the production well № 12892 at Zai-Karataiskayaarea of the Romashkino field has been considered in details. The necessity of the operation was dictated by the low oil output (0,75 t/d) with quite highwatering level (75%). The outcome of the operation was in accordance with the target values: the oil output increased fourfold, water content in production fluid being lower by 10%. The results of slotted perforationat 11 production and 7 injection wells of Leninogorskneftoil and gas production department are presented. In all cases target efficiency was achieved. For objective evaluation of the quality of HSP works the following characteristics need to be determined: cut location, spaces depth and their location in bore hole annulus, the degree of connection between a well and a reservoir.
Cited by 0 works. doi:10.17122/ngdelo-2016-2-72-79