ОПРЕДЕЛЕНИЕ ПОКАЗАТЕЛЕЙ НАДЁЖНОСТИ ПОРШНЕВЫХ КОМПРЕССОРОВ
Файрушин Шамиль Забирович, И.Р. Байков, Сергей Владимирович Китаев · 2016
In the exploitation of technological equipment its periodic maintenance and overhaul is carried out. In a general case the overhaul periodicity is determined either by interrepair cycle (planned -warning character of carrying out the overhaul), or by the appearance of the elements’ faults (carrying out the overhaul on the actual state). For lowering the energy capacity of the technological processes at present energy saving measures are being developed and realized aimed at increasing reliability and energy effectiveness of the equipment operation. On the fuel energy complex objects various kinds of equipment is being used, one of the main ones are those used in many enterprises, compressors for gas compression. The purpose of the work was the investigation of statistic exploitation parameters of the piston compressors for obtaining their reliability characteristics. The experimental base was energy investigation data of the piston compressors type 5Г of one of the refineries of Russia. In the article on the basis of experimental observation of the piston compressors exploited in the refinery, the analysis of their physical wear has been carried out and the dependences of their faultless work probabilities and faults’ intensities have been obtained. Introduction of monitoring with the analysis of the main parameters of the piston compressor work and energy effectiveness indices may be taken as a basis for the anticipatory realization of the overhaul, at the same time satisfactory parameters’ values may serve as a base for increasing interrepair period. The increase of the interrepair period is offered first of all for the aggregates with the best indices of faultless work probability. For the aggregates performing the reserving functions, it’s reasonable to consider modernization variants including the aggregates’ rotation. The dependences of reliability indices obtained in the work may be used for planning the time of carrying out the piston aggregates overhaul from the expenses’ minimization conditions.
Cited by 0 works.