도시철도 승강장 안전발판 시스템 현장 설치 연구
김중진, 장창국, 박종일 et al. · 한국철도학회 학술발표대회논문집 · 2016
Spacing between the metropolitan area urban railway platform and the vehicle reached a maximum 260mm, this has become a cause of foot missing accident of vulnerable road users such as people with disabilities and children. The maximum distance between the platform and the vehicle, which was opened in March 2006 Daejeon Metropolitan Express Transit Corporation Panam Station is 16.2cm. Building in order to prevent the foot missing accident of vulnerable road users due to these intervals, set up a folding automatic safety scaffolding system of the interval is wide eight locations of the vehicle in July 2016, the distance between the vehicle and platform to 3cm below did. This has become a help in the management of a safer city railway for vulnerable road users, such as people with disabilities and children.
Cited by 0 works.