지상신호 검측장치 개발에 관한 연구
양성용, 허대정, 노환희 et al. · 한국철도학회 학술발표대회논문집 · 2016
Currently, in the case of the urban railway of South, it has been the operation of unattended operation or one person. The main reason for this possible, it is development of the signal system. But, most systems there are many difficulties in maintaining a foreign system. Daejeon Express Transit Corporation are operating install the Siemens signal system of the German, No device is in order to confirm the presence or absence of interface disaster developmental abnormalities of the signal equipment, is the fact is there are many problems in maintenance. The purpose of this paper is, maintenance and development of terrestrial signal measurement device is a device for the check of the interface between the Siemens ground signal device and the car on the signal device of Germany, which operates in Daejeon city rail Corporation it is the performance verification.
Cited by 0 works.