БУРЕНИЕ БОКОВОГО СТВОЛА ИЗ СКВАЖИНЫ МАЛОГО ДИАМЕТРА

С Е Ильясов, K. A. Meshcheriakov, Gennadiy Vladimirovich Okromelidze et al. · Нефтяное хозяйство · 2015

There are remaining recoverable reserves in the oil fields of the Perm region, which are unprofitable to develop by the traditional construction of wells (production string diameter - 168 mm) due to the high cost of building. To involve such reserves in the development it was suggested to use the construction of small diameter wells (SDW) with a changing of the traditional design in the direction of reducing the diameter of the production string. According to the results of drilling the cost is reduced up to 25 %. Despite the many advantages, the SDW design has the essential drawback - there is no reliable technology of the sidetrack drilling. That''s why some changes in the SWD structure, which allow to drill of a sidetrack with a kickoff in a technical column and, as a consequence, to save additionally of 24 % of the cost of the new SDW was suggested. Also the economic calculation was made.

Cited by 0 works.

Authors