셰일암을 이용한 고속철도 암석쌓기 장기침하 연구
오태환, 김종주, 이성혁 et al. · 한국철도학회 학술발표대회논문집 · 2016
The sedimentary rock shale is mainly constituted in the region of Daegu, Gyeongju and Ulsan. Those shales are usually used as a embankment material to save construction costs from tunnel excavation. The allowable settlement of concrete slab track is only 30mm and very strictly controlled. If settlement is over the allowable value, costs for maintenance are much higher than ballast track bed. The shale rock in this region has easily breakable characteristics after 1-year exposed but those characteristics cannot be investigated from cycle durability test result.. Thus, the standards of durability quality test for the shale that could be overrated as an embankment material. The basic data for the requirements of a particle size and applicable shale embankment sections are provided in this study.
Cited by 0 works.