기존 댐의 수문설비에 대한 교체시공 사례
홍영철, 김영승, 이경래 et al. · 한국강구조학회 학술발표대회 논문집 · 2013
The Seomjin-gang dam constructed at 1965 is the facility for both flood control and also safe discharge through total 15 gates, and those will be replaced with new hydraulic gates and hoists for stable operation and solution to deterioration problem. This project will be carried out with limited situation of water reserve rates and the weather in operating dam with water. The objects for replacement are hydraulic gates and hoists. Anchorage and guide frame installed in concrete structure will be reused. The existing anchorage has been proved safe by carrying out the safety inspection for reusing in 2010. This case study explains the procedure of replacement construction about teardown and reinstallation and will contribute to management of quality and safety for future project related to replacement of hydraulic gates.
Cited by 0 works.