물량 산출 및 생산성 분석 기반의 거푸집공사 비용공정 통합 모델
지성민, 현창택 · 한국건축시공학회 학술.기술논문발표회 논문집 · 2011
Over the past 20 years, Researchers have tried to develop “Integration Model of Cost and Schedule” in construction industry. They suggested various models and techniques, however, it is still required to develop new methodology for AL Form Work in Public Multi-Housing Projects. Accordingly, this research focused on measuring quantity take-offs of on-going projects and analysing the basic process of using the resources(Labor, Material, Plant) related to cost and time data. There are 3 steps of this research : 1) The literature review of previous studies about Integration Model of Cost and Schedule was conducted. 2) Model for integration between cost and schedule was developed. 3) the accuracy of developed model was verified. The results are expected to improve in integrated managing the cost and schedule data of AL form work.