К обеспечению безопасности аварийно-восстановительных работ на магистральных нефтепроводаХ
Ильдус Ахиярович Сагитов · НАУЧНО-ТЕХНИЧЕСКИЙ ЖУРНАЛ «ПРОБЛЕМЫ СБОРА, ПОДГОТОВКИ И ТРАНСПОРТА НЕФТИ И НЕФТЕПРОДУКТОВ» · 2010
Background The work is devoted to the actual problem of oil total consumption definition in case of emergency break the of the pipe wall. Aims and Objectives The work purpose is to get analytical relations for total flow determining and for the productivity of oil pumped off from the cavity of emergency pipeline to the tank by the pump. Methods The solution of the problem of the total flow determining and the possible pumps productivity measuring, assessment of their impact on the safety of emergency and recovery operations are performed using the Bernoulli equation and the product amount balance in the discharged pipes and connecting pipes sections between efflux pumps and the break of the pipe wall. Results Extraction of oil from the cavity of the pipeline by the required quantity of pumps with the relevant specifications reduces the release of the pipeline and the volume of oil flowing through the gap into the environment, significantly, it increases the safety of emergency and recovery operations.
Cited by 0 works. doi:10.17122/ntj-oil-2010-3-95-100