By understanding the construction process of sea dikes and the current state of the thickness and speed of fluid in the bottom layer protection work of final closure gaps, a construction method applicable for the blocking of bottom layer work will be selected. The three construction methods selected will be tested in site through various methods, and the reinforcement of bottom layer protection and impervious effect will be verified. The verification results are as follows: 1) The overall riprap layer were 0.5~1.0m thicker than planned so that the grouting depth and grout input amount increased 2) The applied construction methods permeability of riprap layers were improved from α×10-2 cm/s before the construction to α×10-4cm/s after construction. 3) The results of core extraction in order to grossly verify the hardening time and durability allowed the identification of grout injection effect. The amount of filling of the injection was difficult to judge because the slime in many areas made the reading of borehole photography difficult.

Cited by 0 works.

Authors