ВДОСКОНАЛЕННЯ МЕТОДИКИ ОЦІНКИ ТРИВАЛОСТІ ФОРМУВАННЯ БАГАТОГРУПНИХ СОСТАВІВ

И. Я. Сковрон · The Scientific Issues of Ternopil Volodymyr Hnatiuk National Pedagogical University Series pedagogy · 2015

The rational technology selection of trains making up process is very important under present-day conditions of the functioning of railway transport. This is particularly relevant when there is the need to intensify of make up process of the multi-group trains. The solution efficiency of this problem depends essentially on the choice of the optimality criterion. On the base of analysis of scientific papers, the duration of train make up process was adopted as the optimality criterion. The usage of this criterion will significantly improve the operational performance of the station. Studies have shown that the solution of the problem was associated with the need of analysis and comparative assessment of a large number of possible schemes of make up process. In this paper the method of determining the duration of shunting semi-runs of the multi-group trains make up process was given. In consideration of the large amount of computation, the method should provide the minimum calculating time of the duration of the train making up on separate scheme with sufficient accuracy. To implement this method the relationship between the train speed limit and the shunting semi-run duration was previously established. For this purpose, the analysis of speedometer tapes of shunting locomotives was done and the dependence of the speed on train movement distance was found. Studies have shown that this approach on the one hand, provides high-speed selection of the rational scheme of the make up process of multi-group trains and on the other hand ensures the required accuracy of the estimations. With a view to practical implementation of the method of choice of rational variant of the technology of train making up in the dispatching personnel decision support system the developed simulation model should be included into automated workplace of shunting manager.

Cited by 0 works.

Authors