Эксплуатационное и напряженное состояние плиты проезжей части сборных балочных пролетных строений автодорожных мостов
В. В. Пархоменко, О. Л. Пархоменко, В. В. Пархоменко et al. · 2019
Roadway slab in spans of bridges works as elastically restrained in arris and relocates efforts from existing loads in longitudinal and transverse directions. Besides, under the impact of temporary loads positive and negative moments occur in the slab, therefore the slab is constantly reinforced in upper and lower zones. In this regard, the most important condition is to ensure strength balance of joints relatively to the main structure. The practice of the precast concrete use has proven that the damage place of joints integrity is the contact between concrete grouting the joint gap and the surface of abutting members. Moreover, if the continuity damage in the connection of new and old concrete does not imply a decrease in strength and deformed properties of joint members, such a joint, as a rule, does not satisfy the requirements of operational reliability. For environment simulation of beams end joints and adherence quality determination of new and old concrete experimental studies on models have been carried out. According to the results of experiments, it was found that preparation quality of jointing concrete surfaces influences on the structure integrity. To estimate the impact degree of the stress on the slab spatial calculations have been performed. A span cross section of 33m in length with a distance of 2,1m between beams were taken as a design scheme. Strength properties of concrete beams and joints – according to results obtained by examination. The load is adopted according to the scheme NK-80 along the axis of grouting joint. As a result of calculations, the stress values of σx, σy, τvn were obtained. Calculation analysis of the stressed state in the slab, dissected by the grouting joint, have shown the character of the effort distribution in members in longitudinal and transverse directions, their concentration in certain cross sections. Results obtained during experimental and theoretical studies provide the opportunity to consider that a number of defects (cracks, damage of concrete integrity), found in the slab of spans, have arisen with a combination of such factors as a poor preparation of concreting surfaces of grouting joints and significant stresses on lower fibres of the slab from operating loads, especially under unfavorable conditions, for example low temperatures and concrete freezing at high humidity.
Cited by 0 works.