건설공사 기성고 산정방법의 개선방안 연구
박순애 · 2018
Today, it is a reality that the criteria for calculation of the payment of the completion cost due to the archetype calculation is insufficient, and accordingly, the reasonable price is not calculated. Prior research has been conducted on the basis of market analysis with simple public opinion surveys prior to institutional improvement, such as the expiration date of dismantling costs, construction dispute prevention and settlement methods, dispute settlement systems, and ADR (Alternative Dispute Resolution) methods. . This study examines the current status and problems of the existing construction construction calculation system by collecting and analyzing data on the calculation of the preliminary article review, the literature survey, the empirical analysis of the experts, and the practical experience of the researcher Discourse and empirical analysis. In addition, in the empirical analysis, 33.10% of the 552 respondents reported that the completed construction amount was calculated by multiplying the contracted quantity by the completed quantity, so that the uncompleted construction cost was not calculated.
Cited by 0 works.