Повышение эффективности эксплуатации скважин в осложненных условиях добычи нефти на Ван-Еганском месторождении
Рустам Расимович Мусин, Камиль Разетдинович Низамов, Рафаэль Тофикович Исрафилов · НАУЧНО-ТЕХНИЧЕСКИЙ ЖУРНАЛ «ПРОБЛЕМЫ СБОРА, ПОДГОТОВКИ И ТРАНСПОРТА НЕФТИ И НЕФТЕПРОДУКТОВ» · 2013
Background The Van-Yeganskoye field is characterized by the complexity of the structure and the non-heterogeneity of reservoirs (stratification, large aquatic areas, large gas caps, low mechanical strength of the reservoir rock, bad rock consolidation and low mechanical strength of the rock), a wide range of phase states of hydrocarbon in more than 60 deposits (from the gas and condensate to heavy oil). The greatest number of electric centrifugal pumps (ECP) failures, installed on 95 % of mining assets associated with complicated operating conditions underground equipment (with the removal of mechanical impurities, corrosion and sedimentation). Aims and Objectives To analyze the reasons of decrease of overhaul period and increase of failures; to develop the effective ways to improve the reliability of underground equipment wells chemicals. Methods There were provided the analysis of the scientific literature, data of failures and overhaul period of underground well equipment, chemicals testing. Results It was established, that the removal of the 500 mg / l of sediments is observed during the oil extraction or injection to the productive strata, the significant excess (dozen times) is observed in wells of Pokurskoe suite. The high content of CO2 (more than 200 mg / l) is a characteristics of water of the reservoirs ПК14 and ЮВ1; significant content (greater than 100 mg / l) characterizes the other layers of the reservoir. H2S content increases as well as the number of sulfate reducing bacteria (SRB). Operation of ECP in deviated wells is associated with localized corrosion in narrow cracks, followed by sedimentation, vibration, degassing of oil, erosion and the friction forces action on casing string. Conclusion Mechanical impurities removal control by reagent Secure SC 2020 reduces the number of ECP failures and increases the overhaul period in 3 ... 4 times, otherwise, periodic dosing of corrosion inhibitor KorMaster 1035 in annulus reduces the number failures in 2,5 times with overhaul period 380 days. The use of sedimentation inhibitors (intermittent dosing of reagents SolMaster 7010, Gyptron R 4601 and microencapsulated Captron 75W) allows to raise the overhaul period up to 435 days.
Cited by 0 works. doi:10.17122/ntj-oil-2013-1-14-21