국가연구개발 정률예외사업의 원가구조분석을 통한 합리적인 사업관리방안
조성표, 하석태, 황명구 · 기술혁신연구 · 2017
Korean government has granted fixed indirect cost rates to several exceptional R&D programs which is lower than the predetermined rate by the government. It has been needed to evaluate the validity of exceptional R&D programs and determine the optimal indirect costs rate of the programs. This study analyzes the cost structure and explores drivers of indirect costs of exceptional R&D programs and evaluates the validity of current indirect costs rates. Finally, we propose the formulas for indirect costs rates of exceptional R&D programs. We analyze the cost structure of the exceptional R&D programs. Equipments and material costs are 50% in infra building program. Scholarship to students is 43% in HRD program. Equipments and material costs are 50% and R&D activity costs are 31% in international R&D program. Main cost components of evaluation program are salary(37%), R&D execution costs(21%) and R&D activity costs(19%). We propose three formulas of indirect costs for exceptional programs. 1) The cost items with exceptionally large amount are excluded in the base of formula for indirect costs. 2) Fixed indirect cost rate is applied for specific R&D programs. 3) Upper bound is set for the cost items with exceptionally large amount in the calculation of indirect costs rate. Our proposal is expected to contribute to the improvement of the efficiency of national R&D programs.
Cited by 0 works.