Визначення рейтингу ризиків проєкту

С. В. Бобров, О. А. Романченко, М. К. Утюшев et al. · Збірник наукових праць Центру воєнно-стратегічних досліджень НУОУ імені Івана Черняховського · 2020

Risks are integral attributes of the functioning of production and commercial enterprises, as well as the creation of automated systems and their components. Moreover, a significant part of IT projects is not brought to the stage of commercial operation. This is due, in particular, to insufficient quality or lack of risk management measures at all stages of the creation of IT systems.Given the diversity of types of risks, the priority is to prevent the occurrence of risks with the greatest degree of danger. This is also facilitated by the problematic nature of identifying all possible risks, financing of all measures to minimize them. Therefore, the methodology for determining the rating of risks and the consequences of their impact is becoming increasingly important in risk management policies.Risk management is a set of methods, techniques and measures that allow determining the occurrence of risk events, taking measures to eliminate them, minimizing negative consequences or rational use of the risk factor in order to optimize activities.An important role in the literature is given to risk assessment methods.The method of risk assessment is a way of determining the probability of a risk, its type, area and measure of impact, as well as possible consequences for the organization. All methods are divided into qualitative and quantitative.The order that allows ranking the risks and draw up a program for managing them is given.Using the proposed method allows you to:- evaluate the “strengths” and “weaknesses” at the stage of creating an IT system and take the necessary measures to improve the efficiency of the process of creating an IT system;- identify at an early stage the most threatening risks and take measures to minimize them.Of course, these estimates are subjective and depend on the level of experts. If statistics can be found by the probability of materialization of risks, then only the expert method is used to determine the impact. But even such an assessment, which is not without subjectivity, seems to be better than its absence.

Cited by 0 works. doi:10.33099/2304-2745/2019-2-66/69-72 Open-access PDF

Authors

References