몬테카를로 시뮬레이션을 이용한 하수처리장의 사후 경제성 분석

김원규, 김주원, 변성준 · Journal of Korean Society of Water Science and Technology · 2018

The sewage treatment plant expansion and the new installation project were carried out before and after construction for reasonable business execution. B/C analysis method is used for general economic analysis. However, B/C analysis by single value may cause policy maker''s wrongness due to lack of distribution characteristic. In this study, the Monte Carlo simulation is used in the economic analysis to overcome these shortcomings. The results of the general B/C analysis were 1.5305 for A sewage treatment plant (extension) and 0.5040 for B sewage treatment plant (new construction). The B/C results using Monte Carlo simulation showed 1.50 ~ 1.56 (70.5%) of A sewage treatment plant and 0.50 ~ 0.56 (66.2%) of B sewage treatment plant. The results of the economic analysis suggested by this probability distribution will be able to more flexibly determine the policies related to the sewage treatment plant.

Cited by 0 works.

Authors