The Network Programming Method in Project Scheduling Problems
Vladimir N. Burkov, I. V. Burkova, Засканов Виктор Гаврилович · Automation and Remote Control · 2020
The network programming method is applied to the discrete problem of minimizing the costs of a project with a given duration. Two basic algorithms for solving this problem in the cases of independent and sequential jobs are described. More complex cases of project scheduling on networks (tree network and aggregated network) are treated by the sequential application of the basic algorithms. For the case of a build-up assembly network, a new method based on the following idea is proposed: an appropriate set of jobs is determined and their durations are fixated so that the resulting network becomes either a tree or an aggregated network. All possible alternatives for fixating the durations of jobs from such a set are considered and, for each alternative, the problem is completely solved. The best alternative among all possible ones is selected. The case of project scheduling on an arbitrary network is also studied.
Cited by 4 works. doi:10.1134/s000511792006003x
Authors
References
- The Complexity of Flowshop and Jobshop Scheduling
- Project Scheduling: A Research Handbook
- A method of network programming in problems of nonlinear optimization
- Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times
- Multi-objective optimization algorithms for flow shop scheduling problem: a review and prospects
- Johnson's algorithm: A key to solve optimally or approximately flow shop scheduling problems with unavailability periods
- The three stage assembly permutation flowshop scheduling problem