멀티프로젝트를 수행하는 전문건설업체의 인력관리시 영향요인 도출 분석

서종민, 김선국 · 한국생태환경건축학회 학술발표대회 논문집 · 2008

In line with the needs of growing number of human resources from various contractors to meet the requirements of the increased work scope, mobilization of manpower in timely manner and efficient management are more than important in implementing the overall management of the project. Thus it’s necessary to evaluate the factors affecting the management of the human resources. The study is aimed at identifying and analyzing the influential factors in the process of manpower management by the specialized construction contractors. The study was implemented in such a way of interviewing the experts as well as using AHP method. The scope was limited to the building work of apartment construction projects. Summarizing the study is as follows. 1) The major elements that have effect on manpower management identified as a result of pair wise comparison of Group 1 were in order of organization of work team, work capability, work continuity and work site conditions. 2) In respect of the importance over the entire Group 2, it was identified as in order of team organization considering individual worker’s personality and character, level of work skill and application of the new technology. The study is expected to bring about the effect of minimizing the manpower, time and cost, while maximizing the work efficiency and performance.

Cited by 0 works.

Authors