کاربرد مدلهای شبکه عصبی مصنوعی، نسبت فراوانی و تابع شواهد قطعی در تهیه نقشه حساسیت به وقوع سیل در حوزه آبخیز هراز: الگویی برای مطالعات مخاطرات سیلاب شهری
هیمن شهابی · فصلنامه علمی - پژوهشی پژوهش و برنامه ریزی شهری · 2021
In this study, artificial neural network (ANN), frequency ratio (FR) and evidential belief function (EBF) methods were used to prepare the flood susceptibility map. For this purpose, the parameters of ten, slope, land curvature, topographic moisture index, distance from river and geology and type of lands in Haraz watershed in Mazandaran province were performed. Eleven conditioning factors including slope, land curvature, distance to river, river density, elevation, rainfall, stream power index (SPI), topographic wetness index (TWI), lithology, land use and normalized difference vegetation index (NDVI) were used in Haraz watershed in Mazandaran province. In addition, 201 floodplains were located in the area. The points were randomly divided into groups of 141 points (70%) and 60 points (30%) for training and validation, respectively. Furthermore, the probability of flooding for each class of each factor was calculated. Hence, the weights obtained for each class in the Geographic Information System (GIS) were applied in the respective layers, and the flood susceptibility maps of the study area were obtained. Based on the flood susceptibility map, the area was divided into 5 classes with very high, high, medium, low and very low sensitivity. These methods were evaluated by area under the curve (AUC) method. The results indicate that the lower and near elevation to river have a high probability and sensitivity to flooding. The results of the current study showed that the frequency ratio (AUC = 0.97) and evidential belief function (AUC = 0.94) and artificial neural network (AUC = 0.87) methods had the highest accuracy in predicting flood occurrence, respectively. The results suggest that these models can be useful and reliable in predicting flood risk potential, especially in different areas, including urban spaces, due to their high efficiency. Extended Abstract Introduction To prevent, control and control floods and Prevention of possible damages, areas with high flood potential first should be considered and foremost identified and then Identify the factors that produce and create floods. In this regard, the level of flood-prone and flood-prone areas in the country has increased and Many cities, villages, industrial and agricultural facilities and residential areas They are at risk of flooding. In the event of a flood There are many factors involved. Generally Climatic factors, regional factors and human factors play a role in creating floods. Climatic factors can be He pointed to Dry area, heavy rainfall and relatively short continuity. One of the most important factors in the field can be mentioned Geological condition, vegetation, basin area, basin shape and form, basin slope and focal point. Also human intervention in the natural water cycle via Destruction of vegetation in watersheds, Irregular land use, Development of impenetrable levels and the like Increased the likelihood of flooding in various areas. In Sail management, some of these factors are controllable and In design, flood control They need more attention. Due to the increasing trend of floods in the country and the growing negative effects of its occurrence in the northern parts of the country, its necessary to reduce the risk of loss of life, property and environmental risk, Necessary measures should be considered. among the various watersheds in the north of the country, in this study, Haraz watershed has been selected as the study area That The reason for choosing it on the one hand It is located and adjacent to key cities in the north of the country, including The cities of Amol, Mahmoud Abad, Babol, Babolsar, Ghaemshahr, Sari, Pol-e Sefid, Shirgah, Neka, Behshahr, Galugah and Bandar-e-Gaz and also Hundreds of rural points and thousands of hectares of agricultural and garden lands and Part of the road along the Caspian Sea (Rasht to Gorgan) and Parts of the mountainous roads of Amol to Tehran and Ghaemshahr to Tehran in this basin and on the other hand There has been a growing flood in recent years in this geographical area that Numerous social, economic and environmental damages and challenges. So these are the reasons The preparation of a flood susceptibility map in the Haraz watershed makes it even more necessary. according to the above and Description of flood hazards in the northern regions of the country, the questions in this study are: What are the most dangerous parts of Haraz watershed in terms of flood sensitivity? Efficiency of which of the artificial neural network models, Frequency ratio and Is the function of definitive evidence more to prepare a flood susceptibility map in Haraz watershed? Methodology Current research in terms of purpose Is a type of applied research and done by quantitative method. According to the objectives of the research, the required data Has been collected from the relevant organizations and organs (Regional Water Company, Natural Resources Department, etc.) and to analyze this data Used the ArcGIS software. Overall, the research process is as follows First Prepared List of past floods in the study area and so on has been identified Effective parameters in flood occurrence and using Three models of definite evidence function (EBF), frequency ratio (FR) and artificial neural network (ANN), A flood sensitization map of Haraz watershed has been prepared. The following is a review Model Validation Using the ROC curve. Results and discussion The weights obtained in each method, for each class of each factor Applied in Geographic Information System (GIS) and Flood susceptibility maps were prepared for Haraz watershed. Flood susceptibility maps Launched in ArcGIS10.3 software environment in five classes, the sensitivity is very low, low, medium, high and very high. In order to assess the accuracy of the flood prediction map, 60 flood events were used (Experimental data) Related to previous courses and These events have not been entered to predict flood potential in probabilistic model
Cited by 2 works. doi:10.30495/jupm.2021.4245