Промысловая подготовка сточных вод на Аскинской группе нефтяных месторождений

Р Р Вагапов, Н Г Хохлов, З М Шагитов · Нефтяное хозяйство · 2006

The way of treatment of the waste water, allowing to refuse installation of additional reservoirs and to inject water in pressure wells after settling during 2-5 days, is tested. The most effective reagents for waste waters treatment with the purpose of injecting them in low-permeability layers of Askinskaya group of petroleum deposits are offered.

Cited by 0 works.

Authors