Применение технических средств для спуска и манжетного цементирования хвостовиков на месторождениях ОАО «Сибнефть-Ноябрьскнефтегаз»
В И Ванифатьев, А М Володин, Б А Ворох et al. · Нефтяное хозяйство · 2004
A wide range of technical means for the reliable isolation of reservoirs during well casing with pipe liners were tested at the factories and in the field. A process flow diagram is suggested for casing a second horizontal branch bore with continuous cementing. The technology of performing operations is discussed.