ПИТАННЯ ЗЕМЛЕУСТРОЮ ТА ГЕОДЕЗИЧНИХ ВИШУКУВАНЬ ПІД ЧАС ПРОЕКТУВАННЯ ТА БУДІВНИЦТВА МОСТІВ

O. M. Pshinko, А. V. Krasnyuk, О. В. Громова et al. · The Scientific Issues of Ternopil Volodymyr Hnatiuk National Pedagogical University Series pedagogy · 2019

Purposes. The aim of this work is the formulation and solution of the problem of regulation precision engineering-geodetic works on the construction stages of bridges. By the method of projections with numerical marks to determine the line of zero work in the design of the earth-sway, the construction of the profile of the topographic surface. Methodology. According to the method of projections with numerical marks, we consider the definition of the line of zero work in the design of the subgrade, if the slope of the subgrade is given graphically. Construction of a profile of a topographic surface in two ways. Findings. In the process of design in the construction of the question of the location of the bridge on a specific location, which requires information about its topography. The irregular shape of the earth’s surface makes it impossible to depict it in normal orthogonal projections on mutually perpendicular areas, as well as in axonometry and perspective. The main image is a horizontal projection, where individual points located at a certain height and lines connecting points with the same height are spoken. Originality. The main advantages of the method of projections with numerical marks: easy to build an image of the object (the simplest method of projection – orthogonal design of the object on only one plane of the projections); convenience in determining the height dimensions of the object, filed in the form of numerical marks of its characteristic points and the relative ease of solving metric problems. The disadvantages include the lack of visibility of the image, as well as the need in some cases to Supplement the main image with vertical sections /so-called profiles. Practical value.. In geodesy, using the method of projections with numerical marks, the terrain is depicted, which allows performing engineering and geodetic exploration and breakdown of structures. This method is also used for the image and design on the earth’s surface of various reclamation and hydraulic structures (dams, dams, embankments, pits, artificial and regulatory structures, reclamation channels) and engineering structures (pits, construction sites, bridges, tunnels, track overpasses).

Cited by 0 works. Open-access PDF

Authors

References