كنترل بار فركانس با حضور جابجاكننده فاز كنترل شدهتريستوري در سيستم قدرت تجديدساختاريافته

حسین شایقی, حیدرعلی شایانفر · 2008

Currently, the electric power industry is in transition from large, vertically integrated utilities providing power at regulated rates to an industry that will incorporate competitive companies selling unbundled power at lower rates. With the emergence of the distinct identities of Gencos, Transco, Discos and Independent System Operator (ISO), many of the ancillary services of a vertically integrated utility will have a different role to play and hence have to be modeled differently. One of these ancillary services is the Load Frequency Control (LFC), which acquires a principal role to enable power exchanges and to provide better conditions for electricity trading. In an open competition environment, LFC becomes a commodity that can be traded and it is a very important component in power system operation and control for supplying sufficient and reliable electric power with good quality. Consequently, it is required that a flexible controller be developed. In the LFC problem, the interconnections among some areas are the input of disturbances, and therefore, it is important to suppress the disturbances by the coordination of governor systems. In contrast, tie-line power flow control by TCPS located between two areas makes it possible to stabilize the system frequency oscillations positively through interconnection, which is also expected to provide a new ancillary service for the further power systems. Thus, a control strategy using controlling the phase angle of TCPS is proposed for provide active control facility of system frequency. Also, the optimum adjustment of PID controller's parameters in a robust way under bilateral contracted scenario following the large step load demands and disturbances with and without TCPS are investigated by particle swarm optimization (PSO), that has a strong ability to find the most optimistic results. This newly developed control strategy combines the advantage of PSO and TCPS and has simple stricture that is easy to implement and tune. To demonstrate the effectiveness of the proposed control strategy a three-area restructured power system is considered as a test system under different operating conditions and system nonlinearities. The results of the proposed PSO based tuned PID controller are compared in the presence of TCPS installed in two tie-lines at power system and without TCPS through time domain simulation and some performance indices. Analysis reveals that the TCPS is quite capable of suppressing the frequency and tie-line power oscillations effectively as compared to that obtained without TCPS for a wide range of plant parameter changes, area load demands and disturbances even in the presence of system nonlinearities.

Cited by 0 works.

Authors