캄보디아 크랑폰리강 유역 수자원 개발사업 관개용수 공급능력 평가

노재경 · 한국농공학회 학술대회초록집 · 2017

This study was performed to evaluate the irrigation water supply capacities of 3 reservoirs called Anlong Chery with 10.95 M㎥ of total water storage and 484 ㎢ of watershed area, Prambei Mom with 1.49 M㎥ and 30 ㎢, and Kdol with 1.73 M㎥ and 45 ㎢ respectively, for the after evaluation of water resources development project in the Cambodian Krang Ponley river basin, in which 3 regulating dams with 1.35 M㎥ and 249 ㎢ in total were constructed in cascaded in the downstream of 3 reservoirs. The daily meteorological data were collected from NASA, by which it was used to simulate reservoir inflows and paddy irrigation waters on each watershed and field. Inflow of Prambei Mom reservoir is transferred and added from Anlong Chery reservoir. Inflows of Tavay regulated dam were consisted of outflows from upstream Anlong Chery, Prambei Mom, and Kdol reservoirs, and local flows from self watershed, and return flows from upstream paddy area. Krepeau Tuoam and Yutasas regulated dams were operated to supply irrigation waters in cascade downstream. Paddy irrigation waters were estimated by transplanting and direct seeding cultivation methods on a daily basis from May to November. The waters from the above 3 reservoirs and 3 regulated dams were analyzed in cascaded to supply irrigation waters by preparing analyzing tool for water balances. Using this analyzing tool, the paddy irrigated area of 5490 ha in total was determined to be supplied from total volume of 15.52 M㎥ with total watershed area of 808 ㎢, in which we can understand to show the water supply capacity to the more wide irrigated area than Korean case in Yedang reservoir with 47.1 M㎥ of total water storage and irrigated area 6917 ha.

Cited by 0 works.

Authors