저수지 홍수변환법에 의한 홍수시 저수지 운영
권오익, 심명필 · 1998
Reservoir operation during flood period can be divided into two parts: One is for an operating policy during flood period to consider water conservation and flood control, and the other is for flood time on a random water level at flood forecasting, This
Cited by 0 works.