황폐계류에 있어서 사방시설물에 (砂防施設物) 의한 하도고정에 (河道固定) 관한 연구
전근우 · 한국산림과학회지(구 한국임학회지) · 1990
In planning the disaster prevention by the erosion control facilities, it is essential to focus on the microtopography of the channel bed and the chronological process of sedimental movement in the torrential streams. For this purpose. the microtopographical change of the channel bed and the effects of the erosion control facilities in the mountain torrents were analyzed by the experimental channel and the field survey of the torrents where low-dam series had been constructed in the channel. The results of this experiment showed that the effects of construction of the low-dam series on the channel bed fixiation were the prevention of the local scouring in the experimental channel and the expansion of flow channel width and deposit space. The results are summarized as follows : 1. When the Low-dam series were constructed over the whole channel bed (L`/L = 1), the conning water and the sediment were seperated, simultaneously resulting in deposition of sediment and reduction of the tractive force for the running water. Therefore, the F.A. (Fluctuation area in cross-section: value was decreased to about 65% compared with that of non-work (L`/L = 0). 2. The efficiencies of the low-dam series on the channel width sere increased with an increment in length of working space. After the construction of low-dam series on the whole channel bed (L`/L = 1), flow- channel width was increased to about 1.53 times compared with that of non-work (L`/L = 0). 3. It needs a deposition area to store the sediment with decrease in tractive force. The low-dam series in the experimental channel widened the deposition area about 2.10 times compared with that of non-work.
Cited by 0 works.