터널굴착 시 전자뇌관과 비전기뇌관 발파에 관한 비교 연구

윤지선, 임수환, 이진무 et al. · 2008

Today, Large and bigger underground construction are increased. In this study, Blating used electronic detonation (OBM Method) and non-electric detonation are carried out. Through comparison with two method, reduction of vibration and noise and efficiency of construction are investigated. As a result of this study, using electronic detonation is shown that it can control lower vibration and noise level, and better HCF, mucfile, advance rate and fragmentation.

Cited by 0 works.

Authors