건설현장 VE실시에 따른 실무적 특성에 관한 연구

곽왕주, 김자연, 김의식 · 공학기술논문지 · 2010

Effective for cost savings and public industries that were introduced in VE to get the maximum value for the target facility with minimum Life Cycle Cost, VE is cost savings that reviewed by functional and alternative through multidisciplinary collaboration with economic review and the feasibility of field application about design detail. However, most of the construction site performed as low level VE activity, because of the issue that the process of design modification and reduction of initial deposit. To activate the VE construction, we to setup the basement of construction VE that come from incentive payments due to system improvement of approval process and construction site database.

Cited by 0 works.

Authors