Проблемы ремонта дорожной одежды на железобетонном мосту через Волгу Саратов Энгельс
Овчинников Игорь Георгиевич, Овчинников Илья Игоревич, Ильченко Екатерина Дмитриевна et al. · Интернет-журнал Науковедение · 2014
This article is devoted to the repair of pavement of the bridge executed in 2014 through the Volga River in Saratov. In it the description of the basic constructive elements of an artificial construction is given in the beginning, data on technical condition of pavement and deformation seams of a bridge construction are provided further. The photographic material and information on a status of a bridge deck after removal of all existing layers of pavement is provided. Reasons for the made decision on constructive layers of new pavement on the bridge are this. In operation the problems which arose in case of the device of pavement on the Obukhovsky cable-stayed bridge through Neva in St. Petersburg (this bridge was selected since on it the pavement of similar construction, but on a steel orthotropic plate) were applied, and in case of the device of pavement on President Bridge through Volga in Ulyanovsk are also described. For comparing material on a status of pavement is given in bridge constructions of the bridge crossing through Volga at the village of Pristannoye of the Saratov region. In the inference of article recommendations about the organization of condition monitoring of pavement on the bridge Saratov Engels with the pro-German construction of pavement and on the main bridge through Volga at the village of Pristannoye with the pro-Finnish construction of pavement, and also on remaining bridges of the bridge crossing through Volga at the village of Pristannoye for the purpose of determination most of efficiency and longevity of this or that construction are made.
Cited by 0 works.