基于高压输电线路实时观测的电线积冰条件
悦 周, 丽娟 赵, 生杰 牛 et al. · Chinese Science Bulletin (Chinese Version) · 2012
利用2008~2009 年冬季华中电网湖北地区500 kV 高压输电线路覆冰状况的实时观测资料, 结合2009 年1~3 月恩施雷达站的积冰厚度、云雾微物理观测以及同期的自动气象站资料, 总结了500 kV 高压输电线覆冰与模拟电线覆冰发生和脱落时气象条件的异同, 并对液水含量进行了计算. 结果表明: 通过恩施雷达站处的气温可以较好地推断出张恩#307 杆塔处的气温; 高压输电线表面温度比环境气温高2~4℃, 且二者呈正相关关系; 高压输电线积冰发生和脱落时的气温明显低于模拟电线积冰观测到的阈值, 其中发生时气温为-2℃左右, 脱落时气温为-2~-1℃; 在积冰厚度较小时, 厚度受气温变化影响明显; 液水含量计算值与观测值的变化趋势基本一致, 但计算值偏大.
Cited by 0 works. doi:10.1360/csb2012-57-4-276 Open-access PDF
Authors
References
- The Computation of Equivalent Potential Temperature
- Atmospheric Icing of Power Networks
- Modeling of Ice Accretion on Wires
- Estimating the Hazard of Ice Accretion in Canada from Climatological Data
- Synoptic-Scale Controls of Persistent Low Temperature and Icy Weather over Southern China in January 2008
- Two-dimensional modelling of the ice accretion process on transmission line wires and conductors
- Ice Loads on a Lattice Tower Estimated by Weather Station Data
- Atmospheric icing in a coastal mountainous terrain. Measurements and numerical simulations, a case study
- Short-Term Ice Accretion Forecasts for Electric Utilities Using the Weather Research and Forecasting Model and a Modified Precipitation-Type Algorithm
- The microphysics of ice accretion on wires: Observations and simulations