组合式模板台车锚段衬砌施工工法
刚 黎, 义 焦, 平 李 et al. · 工程建设 · 2019
On the basis of using the original formwork trolley, a new combined formwork trolley is designed through optimization.On the premise of not affecting the normal section lining construction, it is convenient to operate and the formwork has the function of front and back separation.It solves the problems of anchor section construction safety, quality, construction period, cost, etc. from the tooling, improves the internal and external quality of electrified railway anchor section lining, and is worthy of promotion in tunnel construction with more anchor section lining.
Cited by 0 works. doi:10.33142/ec.v2i2.218 Open-access PDF