Моделирование процесса разработки календарных планов

Шеина Светлана Георгиевна, Надежда Дмитриевна Чередниченко · Интернет-журнал Науковедение · 2014

Preparation for building of object assumes definition of the nomenclature of constructed facilities, terms of their construction and sequence, distribution of capital investments and volumes of construction works, requirements in material and a manpower. Traditionally it is considered that the main objective by preparation of building of object is creation of the planned schedule of works on object. The extensive bibliography in which the general statements of problems of scheduling and creation of planned schedules taking into account stochastic nature of construction production are considered is devoted to the matter. The problem of scheduling is closely connected with a problem of distribution of resources as at a stage of formation of planned schedules there is also a distribution of resources. It is connected with that process of scheduling can be presented as process of distribution of resources of the construction organization in time and space. Thus all variety of resources is subdivided into two groups: stored or material resources and not stored or capacity resources, for example the labor. There is a problem of creation of the planned schedule of performance of work taking into account limited capacity resources. Is accepted that the main limited resource is the number of specialized crews. The problem definition of development of the planned schedule and algorithms of its decision is given.

Cited by 0 works.

Authors