현장적용 가능한 보완식 흙다짐 공법

하태관, 황혜주 · 한국생태환경건축학회 학술발표대회 논문집 · 2010

These days, eco-friendly has been to the fore in the world. Earth architecture has been to the fore in eco-friendly field and various of researches have been in progress to applied in modern architecture. Various of earth methods have applied to interior field and it also has applied to the existing wall of building in complementary using rammed earth method by around 100mm thickness. This study is finding how much of minimum thickness is possible to applied field using ready made goods and examining the construction period and suggesting to reduce the thickness of chink between rammed earth and the existing wall. Test results showed that the minimum thickness was 60mm in ready made goods and the average of construction period was 2 minutes. Average thickness of chink was 0.7mm in the test. so the dryvit mesh can reduce the chink between rammed earth wall and existing wall.

Cited by 0 works.

Authors