Совершенствование методики измерения защитного потенциала стальных корпусов кораблей и судов

Белозёров Павел Александрович, Vladimir Alekseevich Shvetsov, Луценко Алексей Алексеевич et al. · VESTNIK OF ASTRAKHAN STATE TECHNICAL UNIVERSITY SERIES MARINE ENGINEERING AND TECHNOLOGIES · 2014

According to State Standard 9.056-75, it is necessary to measure the vessel hull potential occasionally during exploitation of the anticorrosion protection systems of the vessel hull. However, the vessel crews do not perform this work. One of the reasons of failure to carry out crew’s duties is unreasonable severe demand to the reference electrode arrangement in the seawater relative to the vessel hull, which is determined by State Standard 9.056-75. The aim of the study is to eliminate unreasonable severe demand of the standard procedure of measurement of steel vessel hull potential. For this reason, it is necessary to solve the following tasks: to investigate the influence of the reference electrode immersion depth into the water on the vessel hull potential measurement results, to investigate the influence of the distance between the vessel hull and the reference electrode on the vessel hull potential measurement results. The given tasks were solved by means of the planned experiments and mathematical statistics methods. The results of the experiments and calculations show that the change of the reference electrode immersion depth into the water within 0.0-5.0 m does not affect the accuracy vessel hull potential measurement results. As a result, it is determined that the distance between the vessel hull and the reference electrode may be increased up to 2 meters and the accuracy of the vessel hull potential measurement results does not even decrease. Therefore, it is shown that the steel vessel hull potential measurement procedure can be simplified rejecting the unreasonable severe demand of State Standard 9.056-75. It allows the ship crews to control the state of the steel vessel hull protection systems. The results of this control will allow to direct the vessels to the dock promptly that will lead to the reduction of the ship repairing expenditures and the periods of their accomplishment.

Cited by 0 works.

Authors