Оптимизация процесса биологической очистки сточных вод спиртового завода

Саинова Виктория Николаевна, Аронова Татьяна Александровна, Саинов Дамир Ильдарович · OIL AND GAS TECHNOLOGIES AND ENVIRONMENTAL SAFETY · 2006

Construction and operation of clearing constructions of the industrial enterprises demand great material inputs decrease of which is possible due to a choice of good constructive and technological parameters. The two-level aerobic scheme was exposed to the analysis in construction work at full biological clearing up to biochemical oxygen demand = 25 mg/l and incomplete clearing up to biochemical oxygen demand = 250 mg/l. Specific rapidity of oxidation for each variant was calculated in conditions of a constant doze of active silt. Experimentally certain and calculated parameters will allow to appreciate an opportunity of dump of the cleared sewage both in the city water drain and in a reservoir, and to execute technical and economic analysis of efficiency of application of the given kind of clearing with reference to the sewage of distilleries processing grain raw material.

Cited by 0 works.

Authors