Скорочення термінів будівництва шляхом упорядкування періодів виконання робіт
І. Д. Іванейко, Михайло ІВАНЕЙКО, Сергій РАСПУТНИЙ et al. · The Scientific Issues of Ternopil Volodymyr Hnatiuk National Pedagogical University Series pedagogy · 2025
Construction requires improved principles for optimizing project durations when they deviate from normative values. To fulfill this task, it is first necessary to have information about the workflow, the composition and compatibility of work brigades, and then to apply both existing and newly developed organizational and technological methods to reduce the overall construction time. This paper proposes identifying destabilizing factors and optimization solutions for non-rhythmic construction flows. Destabilizing factors are identified both for the construction process as a whole and for its individual elements. The assessment includes deviations in labor intensity (work duration) and the presence of local and global extrema within the system. The occurrence of local minima in the construction schedule leads to downtime in the network schedule (Critical Path Method), an increase in the deployment and folding periods of work flows, and uneven consumption of labor resources. Another issue in construction is the insufficient availability of labor resources. Therefore, the task is approached through multicriteria optimization based on Pareto efficiency. To address the elimination of local minima, the article presents methods for influencing work durations and examines their impact on resource expenditure. The diagram illustrates a variant design approach for eliminating local minima. The second stage of optimization involves defining the optimization criterion and maximizing the use of similar brigades through the parallel method in the matrix system. In the parallel method, the period during which compatible brigades can work simultaneously is extended. As a result of the two-stage optimization of the non-rhythmic work flow, the following outcomes were achieved: elimination of local extrema; reduction in construction duration (from 153 to 90 days for the flow method, and from 128 to 90 days for network scheduling); nearly identical work periods for installation and integrated brigades (B – 73 days, C…D – 74 days, E – 79 days); and a reduction in the number of brigades on site (from six to five).
Cited by 0 works.