地下水利用による無散水融雪工法の実用化に関する研究
熊谷 元伸, 以左武 野原 · Institutional Repositories DataBase (IRDB) · 1988
Under the notion of prevention of ground subsidence,and preservation of ground water,ground water was circu1ated in a metal piping system laid to7.5cm depth and15 cm pitch in the pavement to me1t away newly fanen snow on the pavement by the gromd water heat.The馴omd water circu1ated in the piping system was retumed into the ground. The experiment was practiced in order to confirm snow me1ting effectエn heavy snowfa11regions by the snow me1ting system. Snowfa1l onto the experimental pavement was complete1y melted away in the fo11owing conditions. Atomospheric temperature range was-1-一4℃,circulating water temperature was13℃at the in1et which turned into8℃at the outlet,density of newly fal1en snow was below0・079/cm3and snowfall intensity per hour was2cm/hr.On the other hand,snowfa1l intensity per hour was2-3cm/hr,then snow condition on the pavement was of sherbet, When snowfa1l intensity per hour was over3cm/hr,it was unable to melt away snow on the pavement due to lack of enough heat. This snow me1ting system wi11be applicab1e to a parking lot,a side wa1k and a narrow street in spite of heavy snowfa11regions. ‡第三研究室 舳前第三研究室(現在範多機械株式会社)
Cited by 0 works. doi:10.24732/nied.00000976 Open-access PDF