ゲルクロマトグラフィーのカラム負荷とランタイム
久弥 田中, 博幸 川崎, 辰美 山本 · Institutional Repositories DataBase (IRDB) · 1996
In order to maximize the throughput P/tc(=S/t_ ) for any given degree of resolution Rs, the operating conditions of column loading S and cycle time t_ were determined.Based on the summation of peak time width 4√<δ_M^2> and leaching time MS_ concerning to cycle time t_ , the relationship among run time TR, resolution Rs and loading S was obtained.Furthrmore, from the linear relation between 1/ κ_ and S with respect to the resolution rate parameter κ_ (=(R_S)^2/t_C), the correlation Rs with S and t_c was derived Using these equations and putting the derivative (d(P/t_c)/dS)_ equal to zero, the optimum conditions of S and t_ could be estimated. The calculated results for previous experimental BD-NaCL gel-chromatograph system were shown.
Cited by 0 works. doi:10.15099/00004528 Open-access PDF