アスファルト固化体の製品データ集
古川登, Toshiyuki Kondo, 星 真之 · Institutional Repositories DataBase (IRDB) · 2001
Low radioactive liquid wastes (LLW) from Tokai Reprocessing Plant were mixed and solidified with bitumen in the Bituminization Demonstration Facility (BDF). In the facility, the treatment operation was started from 1982, and it had been continued until the fire and explosion incident occurred on March 11, 1997. The LLW of 7,438 m$^{3}$ were processed and the bituminized products of 29,967 drums were manufactured in the BDF for about 15 years. The process information of the bituminized products is important for fixing the technology indicator of bituminized products in the disposal. The bituminized products data, that is the inventory of the bitumen quantity, the salt quantity, the radionuclide concentration and so on in the drum, are saved in the main computer of O-arai Engineering Center and the personal computer of the Waste Condition Section. This report summarize the bituminized product data in the list. In addition, if you want to know the manufacture review in the BDF, please refer to "Manufacture Review of the Bituminized Products for Research and Development Program".
Cited by 0 works.